Yard hours: Mon–Fri 8–5, Sat 8–199% of everything we handle is recycled01625 424433
Takes about 2 minutes

Instant demolition estimate

Six quick questions and you’ll have a guide price and programme. Then we’ll visit to confirm a fixed quote — free and no obligation.

Step 1 of 6
What needs to come down?
How big is it?
90 m²
About the size of a 3-bed semi
Storeys
What’s it built from?
Any asbestos?

There’s a legal requirement to survey for asbestos before any demolition.

How’s the access?
Anything else?
Your guide estimate
£0–£0

+ VAT · based on your answers

Programme
Material
Recycled
Includes

PLACEHOLDER rates for the concept — real figures to be set with Cheshire Demolition. A site visit confirms a fixed price.

Lock it in with a free site visit

We’ll call to arrange a survey and send a fixed quote.

Please enter your name
Please enter a phone number
Photos (optional)

Guide price now

Instant range based on size, construction, asbestos and access.

Free site survey

Stan or Alex visits, checks the details and writes a method statement.

Fixed quote

A clear, fixed price — with demolition notice and asbestos survey support.

Concept design · not the official website