Demolition · 4 min read

Do I need permission to demolish?

Usually you need to notify Building Control. Here’s when you don’t, and what else to check first.

When you don’t need to give notice

Notice does not need to be submitted for a shed, greenhouse, conservatory, prefabricated garage, or any building with a cubic content of less than 1,750 cubic feet.

When you do

A demolition notice is required for all other demolition projects and is granted via Building Control. We can help you through the process.

Asbestos comes first

Before any demolition there is a legal requirement to survey the structure for asbestos. A refurbishment/demolition survey decides whether removal must be licensed or unlicensed.

Free quotes · No obligation

Got a job?
Let’s talk.

Demolition, skips, muck away or materials — one call does it all.

Call the office
01625 424433

Mon–Fri 8am–5pm · Sat 8am–1pm

For demolition advice, ask for Stan or Alex
Request a callback
Concept design · not the official website